New win with Bouygues UK:
KKMG Systems Ltd has been appointed as the drylining supply-chain partner for St John’s Academy project in Grove, Oxfordshire – a £28.2m Department for Education project delivering 6,074 m² gross internal floor area for 600 pupils.
With sustainability at the centre – featuring a cross-laminated timber frame, green roof with photovoltaic panels, and extensive SuDS (sustainable drainage systems) – our package includes recycled-content Fermacell boards and a plasterboard take-back scheme to minimise waste and reduce embodied carbon.

